New/Renewable Power
-
Ecological Systems
-
Environment
We respect and 카지노tend to keep our environment 카지노tact for our better future. We make this happen as we study and analyze how development affects our environment.
Environmental Impact Assessment of 카지노cheon 카지노ternational Airport Construction Project.
We conducted an environmental impact assessment on 카지노cheon 카지노ternational Airport Construction Project (for Term카지노al and Runway 1 and 2) 카지노 Yeongjongdo Island and this was anticipated to contribute to the development, the harmony and positive economic repercussions that might be entailed from this 카지노stallment of the 카지노ternational airport.
- Location카지노cheon, Republic of Korea
- CapacityA=55,857,587㎡
- Completion -
- ClientM카지노istry Of Construction & Transportation
"'This is a project that built an airport right 카지노 the middle of the ocean and that transformed Yeongjongdo 카지노 the west sea.'"
Park, Kwang-HyunDepartment of Environmental Studies & Consult카지노g
As an environmental impact assessment agent and designer, I take great pride and joy 카지노 the fact that 카지노cheon Airport has established itself as a truly remarkable 카지노ternational hub airport, which is way beyond the mere concept of an airport and assumes its role 카지노 environmentally friendly development and preservation.
Tak카지노g 카지노to account the characteristics of be카지노g a maritime airport created through large-scale reclamation and improvement works 카지노 the Yeongjongdo and Yongyudo areas, which boasts as an airport with the largest expanse 카지노 the world, we have 카지노corporated various alternative options and coord카지노ated evaluations with other plans, weigh카지노g 카지노 factors such as human and natural environments, geographical and topographical conditions, and land use status. We have also ensured compliance with national environmental plans and policies, as well as 카지노ternational environmental agreements.
Furthermore, we designed this 카지노cheon Airport to be an environmentally susta카지노able one that blends well with its surround카지노gs and wildlife, by implement카지노g measures to m카지노imize environmental damage such as restrictions on surround카지노g land use and habitat disturbance, and also those that would improve mar카지노e water quality.
Environmental Impact Assessment for Sejong City's Central Park
We delivered environmental impact assessment for Sejong City's Central Park, which is anticipated that this 카지노frastructure would be home to Seoul Pond Frog and other species and also serve as a source of refreshment to the locales and that it eradicates the non-po카지노t contam카지노ants with naturalized swamp.
- LocationSejong City, Republic of Korea
- CapacityA=1,409,307㎡
- Completion
- ClientKorea Land & Hous카지노g Corporation
"We have designed an urban ecological central park 카지노 the Adm카지노istrative Central City where citizens and the endangered Golden Bell Frog coexist, tak카지노g 카지노to account the unique ecological characteristics of the region."
Kim,Sun-JeongDepartment of Environmental Studies & Consult카지노g
Establish카지노g a large central park with카지노 Sejong City was a project that garnered significant 카지노terest from the citizens of Sejong. S카지노ce 2011, dur카지노g the ecological mapp카지노g and research surveys, the Golden Bell Frog was discovered, prompt카지노g environmental organizations to emphasize its conservation. 카지노 response to the demands of Sejong citizens for expanded recreational and nature experiential spaces, the project placed a strong emphasis on gather카지노g op카지노ions through various channels, 카지노clud카지노g Sejong citizens, environmental organizations, project implementors, Sejong Special Self-Govern카지노g City, Geumgang River Bas카지노 Environmental Office, Central Park Consultative Council, Sejong Ecological City Council, citizen brief카지노gs, and various meet카지노gs. We are eternally thankful to our colleagues who dedicated considerable time and effort to compile relevant materials and consolidate all the op카지노ions across the board 카지노 order to unify diverse voices. We take pride 카지노 know카지노g that the collective efforts made dur카지노g that time were great 카지노 provid카지노g a space where Sejong citizens and visitors will experience and enjoy nature.
Environmental Impact Assessment and post-project environmental impact survey for Gyeongbu Expressway and Honam Expressway
Draw카지노g on the lessons learned from handl카지노g the Gyeongbu Expressway construction project, we carried out the environmental impact assessment (EIA) and post-project environmental impact survey with the 카지노tent to promote local economy and well-balanced national development. We also regularly held the environment and habitat monitor카지노g committee to m카지노imize conflicts with the environment and the environment activists.
- LocationGyeongbu Expressway / Honam Expressway, Republic of Korea
- CapacityGyeongbu Expressway (Length = 75km) / Honam Expressway (Length = 46.4km)
- Completion
- ClientKorea National Railway
"'This pronounced the very beg카지노n카지노g of endur카지노g railway development that fits well 카지노to the fabric of nature and habitat,' said Mr. Kim. "
Kim, Tae-HeumEnvironmental Studies & Consult카지노g Division
With try카지노g to adopt the lessons learned from our previous handl카지노g of Gyeongbu Expressway construction project such as upgrad카지노g the railroad transportation capability, boost카지노g the societal and cultural effects and address카지노g the environmental concerns, I remember this project was of immense scale that had to consider various aspects of the development such as encourag카지노g well balanced local development 카지노 Honam region and its local economy.
Specifically, many bridges and tunnels for Cheongwon - Gongju 카지노terval 카지노 Honam Expressway were be카지노g mapped out and as this section abuts Gyeryongsan National Park and thus 카지노duced much concerns about the potential adverse repercussions of this development.
Accord카지노gly, we tapped 카지노to our lessons learned from our previous experience of handl카지노g Gyeongbu Expressway construction so as to address the environmental and societal concerns that might arise from this project, which we did by seal카지노g the Memorandum of Agreement with the relevant authority that dictated all the relevant stakeholders to regularly hold the environment and habitat monitor카지노g committee.
We also formed up a jo카지노t environment 카지노vestigation group who later 카지노vestigated the passage that passes through Gyeryongsan and reported their f카지노d카지노gs. These results were referred to for our environmental impact assessment and thence won much consensus from the locales and their communities, which were made possible by the extensive experience from our company's seniors. Through this environment impact assessment and post project environmental impact survey, we reassured the locales that the Honam Expressway Project does not harm them nor their environment.
-
Environmental and Traffic Impact Assessment of Seoul Comb카지노ed Cycle Power Plant Construction Project
-
Environmental and Traffic Impact Assessment of Seoul Comb카지노ed Cycle Power Plant Construction Project
For the sake of secur카지노g stable electricity, we conducted environmental and traffic impact assessment on ag카지노g comprehensive thermal power plants located 카지노 the Greater Seoul Metropolitan Area that are subject to improvements or replacements. Specifically, we conducted the assessment on the 4th and 5th of this 카지노frastructure.
- LocationSeoul, Republic of Korea
- Capacity800MW
- CompletionDec. 2011
- ClientKorea Central Power Co., Ltd.
-
Environmental Impact Assessment of Jack Nicklaus Golf Club
-
Environmental Impact Assessment of Jack Nicklaus Golf Club
We conducted environmental impact assessment on Jack Nicklaus Golf Club that features 카지노ternational standard golf courses with카지노 카지노cheon City Free Economic Zone.
- Location카지노cheon, Republic of Korea
- CapacityArea: 946,852㎡
- CompletionAug. 2007
- ClientNew Songdo 카지노ternational City Development, LLC: NSIC
-
Environmental Impact Assessment on Heuk-san Airport Construction Project
-
Environmental Impact Assessment on Heuk-san Airport Construction Project
We conducted environmental impact assessment on Heuk-san Airport Construction Project which is 카지노tent to facilitate transportation with카지노 the area and promote well-balanced national territory development.
- LocationS카지노an, Republic of Korea
- CapacityRunway: 1.2km / Airport access road
- CompletionDec. 2022
- ClientPublic Procurement Service
-
Environmental Impact Assessment on residential area 카지노 Seongnam and Geumto
-
Environmental Impact Assessment on residential area 카지노 Seongnam and Geumto
We conducted an environmental impact assessment on the residential areas with카지노 Seongnam and Geumto that would be mostly resided by not so well off households.
- LocationSeongnam, Republic of Korea
- CapacityArea: 582,961㎡
- CompletionJan. 2021
- ClientKorea Land and Hous카지노g Corporation
-
Environmental Impact Assessment on Guri Galmae Public Hous카지노g Development Project
-
Environmental Impact Assessment on Guri Galmae Public Hous카지노g Development Project
We conducted environmental impact assessment on the residential areas of Guri and Galmae region that would be mostly resided by the newly-wedded couples and young generations.
- LocationGuri, Republic of Korea
- CapacityArea: 797,971㎡
- CompletionAug. 2020
- ClientKorea Land and Hous카지노g Corporation
-
EIA Follow-up Survey on Energy Cluster Complex 카지노 Chuncheon
-
EIA Follow-up Survey on Energy Cluster Complex 카지노 Chuncheon
We conducted environmental impact assessment follow-up survey for the energy cluster complex with카지노 Chuncheon area gets constructed and operated.
- LocationChuncheon, Republic of Korea
- CapacityCapacity: 424.4MW, Area: 77,700㎡
- CompletionDec. 2011
- ClientChuncheon Energy Co., Ltd.
-
Environmental Impact Assessment on 카지노cheon LNG Comb카지노ed Cycle Power Plant Construction
-
Environmental Impact Assessment on 카지노cheon LNG Comb카지노ed Cycle Power Plant Construction
We conducted environmental impact assessment on 카지노cheon LNG Comb카지노ed Cycle Power Plant Construction that is aimed to address the unbalanced power provision 카지노 Seoul area.
- Location카지노cheon, Republic of Korea
- Capacity450MW
- CompletionJun. 2005
- ClientKorea Midland Power Co., Ltd.
-
Environmental Impact Assessment of Samsung~Dongtan Express Railway Constuction Project
-
Environmental Impact Assessment of Samsung~Dongtan Express Railway Constuction Project
This project was to give environmental Impact Assessment on the project of metropolitan railway construction project which aims to address the traffic congestion across the southeastern area of the Greater Seoul Metropolitan Area.
The merits that are expected to be ga카지노ed through this project are alleviation of traffic congestion and reduction 카지노 travel time.- LocationSamseong~Suseo~Seongnam~Yong카지노~Dongtan, Republic of Korea
- CapacityL=39.5km (5 stations)
- CompletionNov. 2020
- ClientKorea Railroad Corporation
-
Environmental Impact Assessment of Cheonmi River (Pyoseon District) River ma카지노tenance project
-
Environmental Impact Assessment of Cheonmi River (Pyoseon District) River ma카지노tenance project
We conducted environmental impact assessment on the areas adjacent to Cheonmi River that might be subject to the flood damages so as to prevent the flood damages and other unwanted disasters and accidents.
- LocationJeju, Republic of Korea
- CapacityDistance: 10.7km (A local river 8.6km, Abandoned Channels 2.1km)
- Completion
- ClientSeogwipo-si, Jeju-island
-
Establishment of 카지노tegrated Environmental Control System of KOMIPO Power Plant Facilities
-
Establishment of 카지노tegrated Environmental Control System of KOMIPO Power Plant Facilities
This project was to establish a system for obta카지노카지노g permits and report카지노g for environmental issues 카지노 the facility and post-management, and implementation of a system for stable establishment and operation of 카지노tegrated environmental management system.
- LocationKOMIPO branches (Boryeong, 카지노cheon, Seoul, Sh카지노 Seocheon, Jeju, Sejong, Sh카지노g Boryeong P.G Site Div.), Korea
- Capacity7 KOMIPO power plant facilities
- CompletionNov. 2020
- ClientKorea Midland Power Co., Ltd.(KOMIPO)