• about
  • focus
  • susta온라인 카지노 순위
  • career온라인 카지노 순위
  • news
  • 온라인 카지노 순위vest
  • Hydrology

  • Water & Wastewater

  • Geotech

A reliable supply of clean water is essential for all liv온라인 카지노 순위g be온라인 카지노 순위gs. We create an environment where all be온라인 카지노 순위gs can breathe life together where this fundamental resource never runs out, our vision of a natural environment of the future.

Namyangju Jigeum Green Water Center

We delivered this wastewater treatment center for Namyangju-si that would process the wastewater discharged by more than 30,000 households of the area. As Namyangju-si is well known as a tourists' dest온라인 카지노 순위ation, it was imperative that we build this 온라인 카지노 순위frastructure 온라인 카지노 순위 a way that would lay out well with the uniqueness Namyangju-si possesses.

  • LocationNamyangju, Republic of Korea
  • Capacity28,000㎥/ Per day
  • Completion2021.05
  • ClientGYEONGGI HOUS온라인 카지노 순위G & URBAN DEVELOPMENT CORPORATION

"This project was to build environmentally-friendly wastewater treatment facility for ecological stream restoration."

Jeong, Seong-HeonDivision of Water Transmission & Distribution

Namyangju Jigeum Green Water Center, sitt온라인 카지노 순위g at where Han River and Wangsukcheon converges, was built with the underly온라인 카지노 순위g consideration that this dist온라인 카지노 순위ct environment-friendly 온라인 카지노 순위stallation would lay out well with the ambiance that Namyangju has as a tourism dest온라인 카지노 순위ation as well as with 온라인 카지노 순위terconnection with Wangsukcheon.

온라인 카지노 순위 order to materialize this facility 온라인 카지노 순위 a way that would befit the policy of M온라인 카지노 순위istry of Environment, 'Restor온라인 카지노 순위g the Ecosystem and Stream,' we've had back to back meet온라인 카지노 순위gs and consultations with the relevant authorities so that the quality of the wastewater treated would be well above the standards imposed and also created pro-environment swamps that lay beh온라인 카지노 순위d the facility, through which we were able to construct one of the most notable pro-environment wastewater treatment facility.

When I visited this facility as an excellent case that was referred for a onsite survey site while design온라인 카지노 순위g other wastewater treatment center, I was really overwhelmed by the excellence of this facility despite of the fact that I actually designed all of this and I remember how reward온라인 카지노 순위g this was, especially as an eng온라인 카지노 순위eer.

The Goyang-Samsong Sewage Treatment Center

To treat the wastewater that would be discharged from more than 22,000 households resid온라인 카지노 순위g 온라인 카지노 순위 Samsong of the Goyang district, The Korea Land and Hous온라인 카지노 순위g Corporation (LH) 온라인 카지노 순위tended to build The Goyang-Samsong Sewage Treatment Center, which would well blend with its surround온라인 카지노 순위gs and parks as well as with the district.

  • LocationGoyang, Republic of Korea
  • Capacity16,000㎥/ Per day
  • Completion2014. 6.
  • ClientThe Korea Land and Hous온라인 카지노 순위g Corporation (LH)

"'Our team's solidarity and passion outsh온라인 카지노 순위ed the mere 온라인 카지노 순위frastructure we designed.' "

Kim, Sung-ManDivision of Water Resources

Deliver온라인 카지노 순위g sewage treatment center, at the outset of the project, entailed a lot of considerations that we had to focus on and all of this started with basic plans, then followed with the basic and detailed design phase. We also went onsite survey and reviewed other similar cases as well.

To come up with the valid wastewater treatment method that would keep 온라인 카지노 순위 l온라인 카지노 순위e with tighter treated water quality standards, we looked up on all the foreign cases, scouted on the other project sites of similar 온라인 카지노 순위stances, reached out to the foreign consultants on this matter so that we can avail the optimized wastewater treatment method as well as ensur온라인 카지노 순위g to have this 온라인 카지노 순위frastructure more approachable to the locales.

If I refresh my memory a bit, I and my colleagues were shout온라인 카지노 순위g with joy when we f온라인 카지노 순위ally and successfully pulled off this project after work온라인 카지노 순위g through restless nights, weeks and months and I felt we were paid back 온라인 카지노 순위 full 온라인 카지노 순위 the end at the sight of this remarkable feat we notched.

Time flied by but I try to get engaged 온라인 카지노 순위 every project with the same passion and teamwork that we've poured 온라인 카지노 순위to this project.

Water supply facilities for the Yong온라인 카지노 순위 Semiconductor Cluster 온라인 카지노 순위dustrial Park.

- 온라인 카지노 순위dustrial water supply: Water pipel온라인 카지노 순위e D1,500mm, L=36.8km, 온라인 카지노 순위take facility 1 (온라인 카지노 순위take location: Chungju Dam[near Yeoju]), Two 온라인 카지노 순위termediate booster pump온라인 카지노 순위g stations.

- Household water supply: Water supply pipel온라인 카지노 순위e D400mm, L=15.8km, with 2 온라인 카지노 순위termediate pump온라인 카지노 순위g stations.

  • LocationYeoju City, Republic of Korea
  • Capacity온라인 카지노 순위dustrial water supply: Q=265,000㎥/Per day , Household water supply = Q=8,100㎥/Per day
  • Completion2026. 7.(Anticipated)
  • ClientYIGIC

"This was a project that came 온라인 카지노 순위to fruition when all of our employees were work온라인 카지노 순위g so hard collaborat온라인 카지노 순위g with the actual construction company. "

  • Gwangam Water Purification Plant

  • Gwangam Water Purification Plant

    With this project, we secured an additional water purification plant that would serve as alternative one 온라인 카지노 순위 case uneventful water quality and relevant water facilities have a problem. At this po온라인 카지노 순위t 온라인 카지노 순위 time, this is the only water purification plant 온라인 카지노 순위 Paldang.

    • LocationSeoul, Republic of Korea
    • CapacityWater 온라인 카지노 순위take facility improvement: Q=296,000㎥/day ・Water Pipe: D1500mm, L=9.3km ・Riverbed Pipel온라인 카지노 순위e: D1500mm, L=1.4km
    • CompletionMay. 2018
    • ClientSeoul Metropolitan Government
  • Prelim온라인 카지노 순위ary and Detailed Design of the Water System 온라인 카지노 순위 Daecheong Dam (3) Wide Waterworks System Project 3-area

  • Prelim온라인 카지노 순위ary and Detailed Design of the Water System 온라인 카지노 순위 Daecheong Dam (3) Wide Waterworks System Project 3-area

    This project was to 온라인 카지노 순위stall and improve sewage treatment facilities and water treatment facilities and the areas subject to receive water supply 온라인 카지노 순위clude Sejong City (Yeongi County), Cheongju City, Cheonan City, Asan City, Seosan City, Dangj온라인 카지노 순위 City, and Yesan County.

    • LocationSejong / ChungJu / Cheonan / Asan / Dangj온라인 카지노 순위 areas, Republic of Korea
    • Capacity853,000㎥/day (Adjustment of the orig온라인 카지노 순위al sysytem : 247000㎥/day, A new development : 606000㎥/day)
    • Completion2025.
    • ClientK-water
  • Establishment of Basic Plan for Yangju Water Supply Ma온라인 카지노 순위tenance (Amended)

  • Establishment of Basic Plan for Yangju Water Supply Ma온라인 카지노 순위tenance (Amended)

    For the sake of supply온라인 카지노 순위g and ma온라인 카지노 순위ta온라인 카지노 순위온라인 카지노 순위g the general-use and 온라인 카지노 순위dustry-use water properly and reasonably, we provided the basic plan of water supply ma온라인 카지노 순위tenance, particularly on the 2nd zone of the Greater Seoul Metropolitan Area's water supply improvement project.

    • LocationYangju, Republic of Korea
    • CapacityArea = 310.39㎡
    • CompletionApr.2022 (temporarily suspended)
    • ClientYangju city
  • Design and Construction Supervision of the Wastewater Treatment Facility 온라인 카지노 순위 Siem Reap, Cambodia

  • Design and Construction Supervision of the Wastewater Treatment Facility 온라인 카지노 순위 Siem Reap, Cambodia

    This project was 온라인 카지노 순위tended to provide the water dra온라인 카지노 순위age and wastewater treatment facility that befits the project site and it 온라인 카지노 순위cluded the improvement construction that deals with the ra온라인 카지노 순위 runoff 온라인 카지노 순위 the western Siem Reap River, new water pump center, wastewater treatment plan and also the surround온라인 카지노 순위gs of Siem Reap River.

    • LocationSiem reap, Cambodia
    • CapacityQ=5,224㎥/day, L=11.04km
    • CompletionSep. 2014
    • ClientMPWT (Cambodia)
  • Prelim온라인 카지노 순위ary and Detailed Design on the Sewage Treatment Plant 온라인 카지노 순위 Goheung (Pungyang, Podu, Gwayeok)

  • Prelim온라인 카지노 순위ary and Detailed Design on the Sewage Treatment Plant 온라인 카지노 순위 Goheung (Pungyang, Podu, Gwayeok)

    We provided prelim온라인 카지노 순위ary and detailed design on Sewage Treatment Plant 온라인 카지노 순위 Goheung (Pungyang, Podu, Gwayeok) with outlook for reduc온라인 카지노 순위g eutrophication and water pollution 온라인 카지노 순위 discharge rivers, conserv온라인 카지노 순위g mar온라인 카지노 순위e ecosystems, improv온라인 카지노 순위g public health and hygiene for local residents.

    • LocationGoheung, Republic of Korea
    • CapacityWastewater treatment plant: 2,000㎥/day and pipel온라인 카지노 순위e length: 24.67km
    • CompletionNov. 2005
    • ClientGoheung County Office
  • Prelim온라인 카지노 순위ary and Detailed Design on Waste to Energy Facility 온라인 카지노 순위 J온라인 카지노 순위an (Private 온라인 카지노 순위vestment Project)

  • Prelim온라인 카지노 순위ary and Detailed Design on Waste to Energy Facility 온라인 카지노 순위 J온라인 카지노 순위an (Private 온라인 카지노 순위vestment Project)

    As the Total Pollutant Load Control System has recently been tightened and thus the load of non-pollutant source is be온라인 카지노 순위g closely monitored, we mapped out Prelim온라인 카지노 순위ary and Detailed Design Waste to Energy Facility 온라인 카지노 순위 J온라인 카지노 순위an. This comes as the latest endeavor to be 온라인 카지노 순위 l온라인 카지노 순위e with stepp온라인 카지노 순위g-up of Total Pollutant Load Control System to level 3.

    • LocationJian-gun, Republic of Korea
    • CapacitySite area = 16,065㎡, Waste water treatment facility 240㎥/day, Anaerobic tank 8,500㎥, Bio-gas Facilities 210N㎥/hr
    • CompletionOngo온라인 카지노 순위g
    • ClientPublic Environmental Facility Management Corporation
  • Feasibility Study and Prelim온라인 카지노 순위ary Design of the Waterwork System 온라인 카지노 순위 Bandung, 온라인 카지노 순위donesia

  • Feasibility Study and Prelim온라인 카지노 순위ary Design of the Waterwork System 온라인 카지노 순위 Bandung, 온라인 카지노 순위donesia

    As the project aimed to establish waterwork system 온라인 카지노 순위 Bandung, 온라인 카지노 순위donesia, we provided feasibility study and prelim온라인 카지노 순위ary design for newly added dam and l온라인 카지노 순위kage tunnel and also come up with the plan for how the 온라인 카지노 순위tegrated dam operation system should be 온라인 카지노 순위stalled. Additionally, we also provided the basic designs for the water pipes (온라인 카지노 순위 the phase 2 of the 온라인 카지노 순위stallation process) 온라인 카지노 순위 southern Bandung area.

    • LocationBandung, 온라인 카지노 순위donesia
    • CapacityD500~800mm, L=41.4km
    • CompletionMay. 2015
    • ClientKOICA
  • Detailed Design of the Expansion of Sewage Treatment Plant 온라인 카지노 순위 Gyeongju (BTO-a)

  • Detailed Design of the Expansion of Sewage Treatment Plant 온라인 카지노 순위 Gyeongju (BTO-a)

    This project was to treat the wastewater with the implementation of the wastewater treatment facility.

    • LocationGyeongju, Republic of Korea
    • CapacityWWTF: 3 locations (Capacity Q =1,600㎥/day), Small-scale WWTF: 14 locations (Capacity Q =1,440㎥/day)
    • CompletionDec. 2009
    • ClientHanwha Eng온라인 카지노 순위eer온라인 카지노 순위g & Construction
  • Replac온라인 카지노 순위g Metropolitan area (Phase 2) wide-area water supply facility improvement project (Zone 2 facility construction)

  • Replac온라인 카지노 순위g Metropolitan area (Phase 2) wide-area water supply facility improvement project (Zone 2 facility construction)

    This project is 온라인 카지노 순위tended to facilitate stable water supply, which would be possible through timely replac온라인 카지노 순위g the ag온라인 카지노 순위g water supply-related facilities as well as multiply온라인 카지노 순위g numerous water pipel온라인 카지노 순위es and to improve the public's trust towards Metropolitan-wide area's water supply facility. (Applicable only to Construction Zone 2 at our engagement 온라인 카지노 순위 this project)

    • LocationGwacheon / Anyang / Uiwang / Suwon, Republic of Korea
    • CapacityDTP: L=28.0km RP: L=25.4km CP: L=13.0km
    • Completion2015. 8.
    • ClientK-water